Floating wood floors
in Nice

A floating floor is neither glued nor nailed: it holds through its clicked boards and its underlay. Everything is decided in the preparation of the subfloor.

Our approach

Prepare the floor, then lay the boards

An engineered board is 10 to 15 mm thick: it corrects nothing. A slab that dips 3 mm under a 2 m straightedge, and the floor sounds hollow there for good. We check the level, apply a levelling compound where needed, and let the subfloor dry before rolling out the underlay.

Wood moves with the humidity of the air. We leave it 8 to 10 mm against every wall and around pipes, a movement joint where the room exceeds the length allowed by the manufacturer, and new skirting boards cover that gap. On sound, level tiles, the floor goes down without removing them.

What we do

  • Engineered oak boards, high-resistance laminate
  • Level check, levelling compound and drying of the subfloor
  • Acoustic underlay or vapour barrier, depending on the subfloor
  • Floating click installation, including over existing tiles
  • Removal of old skirting and repair of the base of the walls
  • Skirting boards, quadrant beading and threshold bars
  • Junctions with the tiling of wet rooms and the landing
  • Flats in co-owned buildings, villas, business premises

Flatness decides, and it is measured

A floating floor rests on nothing: the boards click into one another and lie loose on an underlay. The whole thing forms a single raft that cannot follow an uneven floor — it bridges it. Wherever the subfloor dips, the raft stays up in the air, and that void shows itself underfoot as movement and to the ear as a hollow sound.

That is measured beforehand, not afterwards: a 2 m straightedge laid in several directions, and the largest hollow recorded. The manufacturers state the tolerance their product allows, and that is what decides whether a levelling compound is needed. We make this check during the visit, because it changes the quotation: a levelling compound is not a line item to be discovered on the day of laying.

The second measurement is an invisible one: the residual moisture in the subfloor. A fresh screed or levelling compound holds water that has to leave before it is shut in under a vapour barrier. Wood laid on a subfloor that is still damp swells; the joints close up and the boards lift, a few weeks later.

Wood moves: gaps, movement joints and thresholds

A wood floor lives with the air of the room. It swells when the air is damp, it shrinks when it is dry, and across the width of a room that movement is measured in millimetres. The whole principle of a floating floor is to leave it room to move.

That room is 8 to 10 mm of gap against every wall, around every heating pipe, against every door frame. The gap is then covered by the new skirting boards and pipe collars: it does not show, but it is there. A floor laid tight against the wall has nowhere to go; it lifts in the middle of the room, and there is no repair for that other than taking it up.

Beyond a certain length, which depends on the product, a movement joint is needed, and at every doorway a threshold that separates two independent rafts. It is also what makes it possible to work on one room later without touching the others.

Then the direction of laying. When in doubt, lay along the longest dimension of the room and with the main light: the end joints blend in instead of being counted, and the room looks longer.

Laying over existing tiles, without taking them up

When the tiling in place is sound, well bonded and flat, the floating floor goes straight over it. It is one of the rare cases where you win on every count: no demolition, no dust, no skip, no disposal — and a job measured in days.

Three checks settle it. First adhesion: tapping a few tiles with a mallet is enough to find what sounds hollow, and what sounds hollow is made good. Then flatness, with the straightedge as above, allowing for hollow grout lines if the tiling is old. And finally height: the new floor rises by the thickness of the underlay and the boards, and the doors still have to clear it and the thresholds still have to be walked over.

That last one is the one most often forgotten. We measure the clearance under the doors during the visit, and if a door has to be planed down, it is written into the quotation beforehand, not noted afterwards.

In a co-owned building: impact sound

Replacing a carpet with a hard floor changes the acoustic life of the building — for the neighbour below more than for you. A footstep, a chair pulled back, an object dropped: these are impact sounds, and they travel through the structure.

Many co-ownership rules cover this point and require the new covering not to worsen the original acoustic performance. The answer lies in the underlay: it is not there for comfort underfoot, it is there to deaden. It is chosen according to the subfloor and the performance sought, and the manufacturers publish the corresponding figures.

So we look at two things before pricing: what your co-ownership rules say, and what the subfloor allows. It is a modest item in a quotation, and it is the one that avoids a dispute with the neighbours lasting years.

On an old timber floor the subject comes with a technical point attached: a floor that creaks before laying will creak after it. The boards underneath are screwed down again while the floor is bare, which is the only moment when that is simple.

Step by step

How the laying proceeds

01

Visit and checks

Flatness with the straightedge, the subfloor tapped, clearance under the doors and thresholds, the co-ownership rules.

02

Quotation

Within 48 working hours. Subfloor preparation, underlay, laying and finishes priced separately.

03

Preparation

Old skirtings removed, the base of the walls made good, levelling compound where needed, drying time respected.

04

Underlay

Acoustic or vapour barrier, depending on the subfloor and the performance sought, laid without unwanted overlaps.

05

Laying the boards

The direction of laying agreed with you, expansion gaps around the edges, movement joints and thresholds at the doorways.

06

Finishes and handover

Skirting boards, quadrant beading, threshold bars, junctions with the tiling. Cleaning and handover with you.

Our projects

What it looks like for real

Click a photo to walk through the project step by step.

The living room halfway through: the boards start from the French windows, in the direction of the light; the cuts of the last row will fall on the kitchen side.
Floating floorThe living room, halfway
In the hallway the boards follow the length: fewer cross joints, and a floor that stretches the room.
Floating floorThe hallway
In the entrance, the acoustic underlay is laid edge to edge and taped before the boards: it is what softens footsteps for the flat below.
Floating floorThe underlay
The old skirting boards have been removed: the floor runs under the new skirting, which will cover the expansion gap against the wall.
Floating floorThe base of the walls
At the entrance the boards meet the door frames flush; the junction with the landing tiles will be made with a threshold bar.
Floating floorThe entrance
The underlay is rolled out only one room ahead: laid too early, it gets walked on and shifts. The hallway is locked together, the next room is waiting its turn.
Floating floorOne room ahead

Your project

A

Send us a few photos and what you have in mind: we will tell you what is possible, and at what budget.

Let's talk it through

How we work

The detail that makes the difference

01

Flatness

A 14 mm board does not correct a dipping slab. A 2 m straightedge, levelling compound if needed, and a dry subfloor before the underlay.

02

The expansion gap

8 to 10 mm against every wall, around pipes, and a movement joint beyond the allowed length. Wood moves; we leave it room.

03

The direction of laying

With the light in the living room, along the length in the hallway. The cuts of the last row are planned from the first.

Frequently asked questions

Wood flooring: your questions

Can you lay over my tiles without breaking them up?

Most of the time yes, if the tiling is sound, well bonded and flat. We tap it and check the flatness during the visit. The only point to watch is the height gained: the doors still have to clear. We measure those heights before pricing, and any planing down appears in the quotation.

Engineered or laminate?

An engineered board has a real layer of wood on the surface: the look and the feel of solid wood, and depending on its thickness, the possibility of being sanded once. A laminate is a printed decor under a protective layer: very resistant to scratching, indifferent to heavy traffic, but it cannot be renovated. The choice depends on the room and on the use, and we show you both.

Is a floating floor noisy?

It is if the underlay is chosen at random. Its job is not comfort underfoot but the deadening of impact sounds, the ones that disturb the neighbour below. Many co-ownership rules cover this point; we check it before pricing.

Can it be laid in a kitchen or a bathroom?

In a kitchen, yes, with a suitable product and the perimeter joints dealt with. In a bathroom, no: standing water and steam do not suit a floating floor. We then propose tiling, or a wood-effect stoneware, which gives the same look without the risk.

How long does the laying take?

The laying itself is quick. What lengthens the job is the preparation: a levelling compound has to dry before anything goes over it. The programme issued with the quotation separates the two, so you know when the room will be usable again.

We work in Nice, across the Alpes-Maritimes and right along the French Riviera

NiceAntibesSaint-Jean-Cap-FerratBeaulieu-sur-MerCap d'AilValbonneSaint-Paul-de-VenceMentonVenceRoquebrune-Cap-MartinCannesMonacoVillefranche-sur-MerÈzeMouginsSophia-AntipolisCagnes-sur-MerGrasseLe Cannet

For a quote, let's talk

Let's bring to life

Tell us about your project: we will come back to you within 48 hours for a first conversation and a visit to the property. Survey and site visit free of charge in Nice and across the French Riviera.

Call usRequest a quote