Architecture &project management

Space planning, drawings, coordination of every trade. Your project thought through down to its smallest proportions.

Our approach

Draw it

A drawing costs infinitely less than a wall knocked down twice. Before any work starts, we survey what is there, establish what the structure allows, and draw up several layout options — circulation, light, storage, the proportions of each room.

You choose from the drawings, knowing the budget for each option. Only then does the work begin, on a specification that every trade shares.

The commission covers

  • Measured survey and feasibility study
  • Layout drawings and alternative room plans
  • Technical drawings: electrics, plumbing, lighting
  • Selection of materials and colours
  • Detailed costings, line by line
  • Programme and sequencing of the trades
  • Tendering and coordination of contractors
  • Site meetings and written reports
  • Practical completion and snagging

What a drawing settles before the works

A drawing is not there to look good on a screen. It is there to settle, on paper, questions that would be expensive to settle on site: where the waste pipe runs, which partition can come down, where to find the fifteen centimetres that make a bathroom usable, how to open up without weakening anything.

We survey what is there on site, to the actual dimensions and not to those of the original drawing — in a period building the difference is commonly several centimetres. Then we draw the proposed state: partitions, services, water points, electrics, openings. That set of drawings is what the quotation and the works are then based on, and it is the reason the quotation matches what is built.

Prior declaration or planning permission: what is applied for, and when

Anything that stays inside and changes neither the façade, nor the openings, nor the floor area needs no planning consent at all. As soon as the outward appearance is altered — a window, a shutter, a balustrade, the colour of the render — a prior declaration of works is required. Above the thresholds for new floor area, or for a significant extension, it is planning permission.

In Nice, two further points apply. Within the protected areas — Old Nice, the surroundings of listed monuments — the Architecte des Bâtiments de France gives an opinion that is binding, and the time it takes lengthens the programme. And in a co-owned building, planning consent never replaces a vote at the general meeting: both are needed, and they are not applied for at the same moment.

We put the file together, we lodge it and we follow it through. You do not have to learn French planning law to have your apartment renovated.

Project management: who does what

Designing and building are two trades. Project management means holding the second to the service of the first: tendering, comparing, planning, checking what is done, verifying the interim accounts, organising practical completion and following the snags through to the end.

When we take on both, the drawing and the site do not contradict each other — what was drawn is what is built, by the same teams. When you already have an architect, we work on the building side: we price his project and we carry it out, without redrawing what has already been settled.

What is decided early and cannot be undone

The finished ceiling height once the linings and the suspended ceiling are in. The direction a floor is laid in, which gives a run of rooms its perspective. The exact position of a water point, which decides the fall of the waste pipe. The position of the light switches, which decides the daily comfort of the place for the next twenty years.

Those choices are made on the drawing, calmly, before the first wall comes down. This is the moment when an hour of thought is worth a week on site.

Step by step

How a commission proceeds

01

Visit and survey

Measured survey of what is there to the actual dimensions, condition of the services, access and structural constraints.

02

Sketch design

One or more layout options, discussed with you before going any further.

03

Technical drawings

Partitions, services, water points, electrics, openings. The quotation is priced on these.

04

Consents

Prior declaration or planning permission, file for the general meeting, the application followed through.

05

Site supervision

Programme, coordination of the trades, checking what is done before closing up.

06

Practical completion

Handover with you, snags recorded, snags cleared and the documents handed over.

How we work

The detail

01

Proportions first

The height of a window sill, the width of an opening, a door lined up with a window: these are the decisions that let a place breathe.

02

Light as a material

Orientation, openings, integrated lighting. You draw as much with light as with partitions.

03

Everything settled before demolition

Materials chosen, quantities known, programme agreed. Surprises on site almost always come from a study done too quickly.

Frequently asked questions

Designing and overseeing: your questions

Do you need an architect to renovate an apartment?

It is only mandatory above the floor-area thresholds set by law, or for certain permission applications. Below them, what counts is the technical drawings and the supervision: that is what we provide.

Which works need a prior declaration?

Anything that alters the outward appearance: a window, a shutter, a balustrade, the colour of the render, or new floor area above the threshold. In the protected areas of Nice, the opinion of the Architecte des Bâtiments de France is required as well, and it lengthens the process.

Is planning consent enough in a co-owned building?

No. Both are needed and they are independent: planning consent comes from the town hall, the vote comes from the general meeting. We prepare both files and we set them in the right order.

Can we commission the drawings alone?

Yes. And the other way round: if you already have an architect, we price and carry out his project without redrawing it.

When is a structural engineer needed?

As soon as a load-bearing element is affected: an opening in a wall, the removal of a column, a new floor opening. The calculation note governs the propping and the way the load is taken up. We have it drawn up and we build accordingly.

We work in Nice, across the Alpes-Maritimes and right along the French Riviera

NiceAntibesSaint-Jean-Cap-FerratBeaulieu-sur-MerCap d'AilValbonneSaint-Paul-de-VenceMentonVenceRoquebrune-Cap-MartinCannesMonacoVillefranche-sur-MerÈzeMouginsSophia-AntipolisCagnes-sur-MerGrasseLe Cannet

For a quote, let's talk

Let's bring to life

Tell us about your project: we will come back to you within 48 hours for a first conversation and a visit to the property.