All-trades contractorNice, Monaco & French Riviera — 06
Helical cast-in-place concrete stair, lime-rendered, with no stringer and no central column. A piece that is drawn before it is poured.

HomeExpertiseSignature rooms

Signature

Bespoke kitchens, bathrooms and dressing rooms. The rooms of everyday life treated as the centrepieces.

Our approach

The rooms you use

A kitchen and a bathroom bring together, in a few square metres, almost every building trade there is: masonry, tanking, plumbing, electrics, joinery, tiling, glazing. This is where poor coordination shows up fastest.

We treat them as centrepieces: laser setting out, joinery drawn to the millimetre, services fixed before anything is fitted, and materials chosen to age well in a wet room.

Our bespoke work

  • Bespoke kitchens and islands
  • Complete bathrooms and shower rooms
  • Walk-in showers, floor-level trays
  • Dressing rooms, wardrobes and bookcases
  • Bathroom furniture and vanity tops
  • Glazed screens and partitions
  • Recesses, integrated lighting and cove lighting
  • Brassware, sanitaryware and heating

A signature room is prepared in the structural work

What makes a kitchen or a bathroom look self-evident is not settled when the units go in. It is settled three months earlier, when it is decided where the waste pipe runs, where the light falls, which partition moves back by ten centimetres, and where to allow for a supply that may never be used.

A room that fails is almost always a room whose services were installed before the layout was settled. It is then worked around: a boxing here, a bulkhead there, a unit cut short. The result works, but it shows.

So we settle the layout to the centimetre before the walls are opened: worktop heights, door swings, edge thicknesses, the exact position of the water points and the sockets. It is the only way to get lines that answer one another.

Kitchen, bathroom, dressing room: what sets them apart

The kitchen is a technical room dressed up as a living room. Waste, water supply, extraction for the hood, the electrical load available, and a worktop that has to stay flat over three metres. The setting out of the splashback follows the units, never the other way round. How we go about it, from survey to fitting, is set out on our page Kitchen renovation in Nice.

The bathroom lives with water and steam. A waterproofing system under the tiles, the fall to the waste, ventilation, and substrates that do not move: a tray flush with the floor needs a void formed in the structural work, not an improvised alteration.

The dressing room is a matter of dimensions and light. Usable depth, hanging height, drawers that open all the way, and lighting that renders colour — a badly lit dressing room is of no use at all.

The dimensions that forgive nothing

In a period building a wall is never straight and a floor is never level. A standard unit set against a wall that is out of true leaves a gap that widens over two metres. That is why we survey to the actual dimensions, and why in a signature room bespoke work is not a luxury but a technical answer: it is what takes up the fabric of the building.

The same goes for the junctions: a brass trim where two materials meet, a skirting that follows a curve without a mitre, a layout centred on a waste outlet. These are details of a few millimetres, and they are the ones people notice.

Timescales: bespoke work imposes its own calendar

A made-to-measure cabinet front, dressed stone, a limited-run tap is ordered when the quotation is signed. The manufacturing lead times then run while the structural work goes ahead: that is what allows fitting to start without waiting, and keeps a room from standing open for weeks.

The programme states what is being made, what is in stock and what governs the next stage. You know which decision, put off by a week, moves the whole job by a month.

Step by step

How the work proceeds

01

Visit and survey

Measured survey of the room to the actual dimensions, condition of the services, waste and ventilation constraints.

02

Layout

A layout drawing to the centimetre: units, water points, sockets, lighting, door swings.

03

Quotation and orders

Quotation within 48 working hours. The bespoke items are ordered as soon as it is agreed.

04

Structural work and services

Strip-out, substrates made good, voids formed, plumbing and electrics checked before closing up.

05

Substrates and waterproofing

Linings, screed, waterproofing under the tiles, levels corrected. Nothing is laid on a doubtful substrate.

06

Fitting and handover

Tiling, units, brassware, finishes and junctions. Handover with you, snags cleared.

How we work

The detail

01

Waterproofing before looks

Tanking matting or a waterproofing system under the tiles, upstands, falls kept under control. A walk-in shower is judged in ten years' time, not on handover day.

02

The millimetre

Laser setting out, layout worked out in advance, cuts shared out. The joints fall where they should, the skirtings line up, the cupboard doors sit flush.

03

Light in the right place

Task lighting, coves, backlit recesses, high-CRI lamps at the mirrors. A fine material badly lit gives nothing back.

Frequently asked questions

A signature room: your questions

Bespoke or standard units?

In a period building, bespoke is often the technical answer: it is what takes up a wall out of true or a floor that is not level. In a recent building, a good standard range properly fitted gives an equivalent result for less. We say which at the survey, room by room.

Can a bathroom or a kitchen be moved?

Often yes, provided the fall to the existing stack can be held. That is what decides it, not the distance. If the stack itself has to be touched, you are into the common parts and a vote at the general meeting is required.

How long without a kitchen or a bathroom?

The room is out of use from the start of the strip-out to the last of the finishes. The programme issued with the quotation gives that period room by room, and we order the work so that you always keep one usable water point where that is possible.

Do you supply the materials and the equipment?

Yes, and you can also supply all or part of them yourself. In that case we check compatibility before anything is ordered, and the quotation separates supply from installation.

What does HEXABAT guarantee on this work?

Professional liability insurance and the ten-year structural warranty (garantie décennale); the certificates are attached to every quotation.

We work in Nice, across the Alpes-Maritimes and right along the French Riviera

NiceAntibesSaint-Jean-Cap-FerratBeaulieu-sur-MerCap d'AilValbonneSaint-Paul-de-VenceMentonVenceRoquebrune-Cap-MartinCannesMonacoVillefranche-sur-MerÈzeMouginsSophia-AntipolisCagnes-sur-MerGrasseLe Cannet

For a quote, let's talk

Let's bring to life

Tell us about your project: we will come back to you within 48 hours for a first conversation and a visit to the property.

Call usRequest a quote