All-trades contractorNice, Monaco & French Riviera — 06
The Sheraton in Nice. A tall, fully glazed lobby.

HomeProjectsHotel ceiling

Hotel ceiling, working at height

In the Sheraton's glazed lobby, ducted air conditioning was leaking above the suspended ceiling: the board had given way and the artwork hung 5.20 m above the floor. Condensate drain put right, ceiling rebuilt, new access hatch — all of it from a rolling tower.

Ceiling & air conditioning — Sheraton hotel, Nice · 6 photos

The Sheraton in Nice. A tall, fully glazed lobby.
1/6The hotel
The decorated ceiling restored: the repair is barely read, cut square and in line with the joint.
2/6The lobby, made good
New plasterboard, white paint and a 600 × 600 access hatch: the unit can be reached again without reopening anything.
3/6The ceiling rebuilt, with its hatch
The white rectangle stops dead against the artwork, on the line set out before the strip-out. The new hatch sits inside it.
4/6The repaired area, seen from the tower
Five metres twenty to the ceiling: the whole job was carried out from a rolling tower, in a fully glazed lobby.
5/6The mobile tower in the lobby
Water from the air conditioning had come through the suspended ceiling: collapsed board, bare insulation and a strip of artwork hanging in the void.
6/6Before: the board had come down

For a quote, let's talk

Let's bring to life

A project like this in your own home? Send us a few photos and what you have in mind: we will come back to you within 48 hours.

Call usRequest a quote