Hotels, shops, offices: what each place demands
Hotels. Promenade des Anglais, Carré d'Or, behind the port: rooms are let all year and lobbies are crossed day and night. We work floor by floor, or at night, with protection put up in the evening and taken down in the morning. The height of a lobby calls for a mobile tower or a scaffold, erected and brought back down the same night so the way is clear at opening.
Shops and restaurants. Rue Masséna, avenue Jean-Médecin, Old Nice, the Port: a closed shopfront costs more than the works. The heavy part is done before opening or during the annual closure, deliveries are arranged with the highways department, and the fit-out goes in at one pass. Where it is realistic, we also price the “shop open” scenario so you can compare.
Offices and common areas. Arénas, Nice Méridia, Saint-Isidore, and also the lobbies and stairwells of apartment buildings: occupied floors, services in raised floors or above ceilings, comms racks that must not be switched off. We move in blocks: desks are shifted, the zone is done, it is handed back the next day.
Working in an occupied building
Phasing. The job is cut into zones and slots, each with a hand-back date. That division, far more than the total duration, decides what your customers will see.
Hours. Night, early morning, weekends, the weekly closing day: noisy periods are fixed in advance and kept to. They appear on the quote, because they have a price.
Dust and noise. Sealed screens, sheeting on floors and accesses, extraction at the source when cutting, a fine clean before every hand-back. Paint smells are dealt with by choosing the product and ventilating, not by hoping they pass.
Access. One route for the public, another for the works, where the building allows it. Otherwise deliveries and clearance happen outside opening hours.
Safety, standards and inspections
A hotel, a shop or a restaurant are premises open to the public. Everything touching partitions, ceilings, smoke extraction or exits is governed by precise rules: we install materials for which we supply the fire-reaction test certificates, and we work with the building's own inspection body rather than in its place.
Electrical installations are brought up to NF C 15-100, boards and protective devices included, and the certificate of compliance is applied for when the installation is new. In plumbing, wastes and ventilation are checked before anything is closed up: a ceiling is a poor thing to reopen.
When the works change the way the public is received, accessibility comes into it. We flag it at the survey and we build what your project manager, architect or inspection body has approved. We do not file the regulatory submissions; we supply what those submissions need.
Quote, programme and one point of contact
The quote comes within 48 working hours of the survey, trade by trade, with the working hours agreed and the phasing set out. It can be invoiced phase by phase, which makes approvals simpler when several people sign off.
One person follows the job from the first survey to the last snag. We work directly with the operator as readily as with a project manager, an architect or a managing agent. The individual trades are set out on our pages plumbing and electrics, painting and ceilings, tiling and full renovation.