Common areas: what gets renovated, and in what order
Hall and entrance. It is the first image of the building, and the most heavily used place. The ceiling comes first, then the walls, then the floor: always from the top down, so as not to damage what has just been laid.
Stairwell and landings. A wall is prepared before it is painted: cracks opened up then filled, skim coat, sanding, paint. We move floor by floor, keeping the stairs usable.
After water damage
A leak leaves behind a stained, blistered or fallen ceiling, and walls to make good. We do not attend the leak itself as an emergency: we put things right once its cause has been repaired and the substrate is dry. Removal of what is damaged, framing and boards made good, jointing, skim coat, paint.
The quote is itemised line by line: it can be passed on as it stands to the building's insurer or to that of the owner concerned.